Skip to main content

Makiga Engineering Services Ltd | Durable & Affordable Construction Machines

Kenya - Head Office

Kenya Industrial Estates, Lokitaung Rd, Nairobi Kenya; +254722669730, Phone: +254721599866; Email: sales@makiga-engineering.com

Uganda Branch

Plot 70; 8th Street Industrial Area Namwongo Road; Phone: +256756566566 ; +256776488 688; Email: sales@makiga-engineering.com

Tanzania Branch

Congo / Kiungani street, Dar es Salaam, Tanzania; +255740199974; E-mail: makigatz@gmail.com

Rwanda Branch

Rwanda Offices Kigali, Rwanda +250787304403; +250785244750 Email: makigarw@gmail.com

images
Contact Us

All Cart

Cart

  • November 4, 2026
  • 0 Comments

Pressing a block is only half the job. Cement needs moisture and time to harden, and blocks that dry out too fast end up weak, chalky and cracked. Curing costs almost nothing but has a big effect on the quality of your walls.

Handle fresh blocks gently

Newly pressed blocks have little strength. Lift them with both hands, keep the edges and interlocking parts intact, and place them on a firm, level surface rather than stacking them straight away. Avoid moving them more than necessary during the first day.

Keep them in the shade

Direct sun and wind pull water out of the block surface before the cement can use it. Set up the curing area in shade, or under a roof of sheeting or thatch with open sides for air movement. Choose a spot that stays dry underfoot and does not flood in heavy rain.

Cover and keep damp

  • After the first day, cover the blocks with plastic sheeting, old sacks or grass.
  • Sprinkle water gently over the cover, usually morning and evening, so the blocks stay damp but not soaked.
  • Keep this up for at least a week. In hot, dry weather, wet them more often.

Stack carefully

Once the blocks have hardened enough to handle without damage, stack them in neat rows with small gaps for air. Keep stacks to a sensible height so the bottom layers are not crushed, and keep them covered or under shelter.

Be patient before building

Blocks continue to gain strength for weeks. Many builders wait around four weeks from pressing before using blocks in loadbearing walls. If the schedule is tight, ask your engineer what minimum age is acceptable for your design.

Signs of poor curing

  • Surface dusting or powdery edges
  • Fine cracks across the faces
  • Corners that crumble when blocks are handled
  • Blocks that soften quickly when wet

If you see these, review your shading and watering routine, and check your cement content with a fresh trial batch.

Plan the yard in advance

A production rate of several hundred blocks a day needs real space for curing. Our guide to organising a block-making site explains how to lay out the yard so blocks move smoothly from press to stack.