Freshly pressed blocks need moisture to hydrate the cement fully, so they should be covered and kept damp for at least 7 days — up to 14–28 days for concrete blocks. Dry curing leads to cracking and weak blocks, undermining the whole structure.

Stack cured blocks in the shade and wet them regularly, especially in hot, dry weather. Proper curing can more than double final strength, protecting your investment in materials and labour.