ISSB blocks typically use 5–10% cement by volume mixed with 90–95% soil, plus enough water to bind without making the mix sloppy. More cement increases strength and weather resistance but raises cost, so the ratio is tuned to the soil and the wall's role.

Consistent measurement and thorough mixing are critical — uneven cement distribution causes weak spots. Test a few blocks before full production to confirm the chosen ratio meets strength needs.