Makiga Engineering Services Ltd | Durable & Affordable Construction Machines
Pressing a block is only half the job. Cement needs moisture and time to harden, and blocks that dry out too fast end up weak, chalky and cracked. Curing costs almost nothing but has a big effect on the quality of your walls.
Newly pressed blocks have little strength. Lift them with both hands, keep the edges and interlocking parts intact, and place them on a firm, level surface rather than stacking them straight away. Avoid moving them more than necessary during the first day.
Direct sun and wind pull water out of the block surface before the cement can use it. Set up the curing area in shade, or under a roof of sheeting or thatch with open sides for air movement. Choose a spot that stays dry underfoot and does not flood in heavy rain.
Once the blocks have hardened enough to handle without damage, stack them in neat rows with small gaps for air. Keep stacks to a sensible height so the bottom layers are not crushed, and keep them covered or under shelter.
Blocks continue to gain strength for weeks. Many builders wait around four weeks from pressing before using blocks in loadbearing walls. If the schedule is tight, ask your engineer what minimum age is acceptable for your design.
If you see these, review your shading and watering routine, and check your cement content with a fresh trial batch.
A production rate of several hundred blocks a day needs real space for curing. Our guide to organising a block-making site explains how to lay out the yard so blocks move smoothly from press to stack.